My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Centennial Greenways
Public Access
>
Boards and Commissions
>
Plan Commission
>
2023 Comprehensive Plan
>
Archive (2015 Incomplete Update)
>
Comprehensive Plan Update - 2015 to present
>
Past Plans
>
Centennial Greenways
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2015 5:07:59 PM
Creation date
11/25/2015 5:07:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Baur intersection should be improved, and traffic signal timing adjusted, to allow for pedestrian crossing of the intersection. The potential to construct a pedestrian bridge over Lindbergh <br />in the vicinity of the intersection should also be explored utilizing the slopes on each side of Lindbergh. During these studies careful attention will need to be given to the existing <br />power lines to <br />At Lindbergh, the Centennial Greenway will cross to the south side of Schuetz Road. The pedestrian crossings at the Lindbergh- <br />determine feasibility. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.