My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-04 Agenda
Public Access
>
City Council Agenda
>
2007
>
2007-09-04 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2007 9:37:13 AM
Creation date
9/4/2007 4:46:59 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Retrofit Design and Implementation – Design HVAC, lighting, and envelope retrofits <br />that yield maximum energy savings for existing buildings. ESI provides construction <br />J-3-n <br />management services for bidding, demolition, and installation processes. We look to <br />minimize future operation and maintenance costs for clients and incorporate life cycle <br />costing for major pieces of equipment. <br /> Manufacturing Processes – Analyze the energy requirements of existing <br />manufacturing processes and make design recommendations for increased efficiency. <br /> Energy Master Planning: <br /> Energy Solutions, Inc. (ESI) specializes in working with institutional clients to <br />develop a comprehensive strategy to investment in energy efficiency. ESI's approach <br />incorporates an integrated building systems perspective and life cycle cost/benefit <br />analysis. <br /> Energy Policy Development – Establish organizational goals and financial criteria <br />for energy efficiency investments (ROI and payback). <br /> Energy Audits – Identify utility consumption patterns, site heating and cooling loads, <br />and opportunities for energy savings. <br /> Source: http://www.energysolutions-stl.com <br />Development Schedule <br /> <br /> The development schedule is contingent upon the speed at which University City <br />can process paperwork and grant approval. However, the following illustrates conservative <br />estimates for each main task in the development schedule: <br /> Task Time <br /> (days) <br /> <br />1 Pre-Development 60 <br /> <br />September 4, 2007 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.