Laserfiche WebLink
<br /> <br /> <br />DISBURSING COSTS 3,800 <br /> <br />J-3-q <br />CLOSING FEES AND COSTS 9,655 <br /> <br />EXCAVATION 8,500 <br /> <br />BACKFILL 3,500 <br /> <br />FOOTING AND FOUNDATIONS 45,000 <br /> <br />ROCK 5,500 <br /> <br />WATERPROOFING 4,800 <br /> <br />STEEL 12,000 <br /> <br />MATERIALS - LUMBER 165,000 <br /> <br />MATERIALS - TRUSSES 64,000 <br /> <br />FRAMING LABOR 145,000 <br /> <br />BASEMENT FLATWORK - LABOR 23,600 <br /> <br />BASEMENT FLATWORK - CONCRETE 14,800 <br /> <br />GUTTERS AND DOWNSPOUTS 3,800 <br /> <br />ROUGH PLUMBING 121,000 <br /> <br />SPRINKLER SYSTEM 104,000 <br /> <br />ROUGH ELECTRICAL 105,600 <br /> <br />LOW VOLTAGE ELECTRICAL 26,400 <br /> <br />ALARM 14,300 <br /> <br />ROUGH HVAC 77,000 <br /> <br />ELEVATOR 149,460 <br /> <br />ROOFING - MATERIAL 15,300 <br />ROOFING - LABOR <br /> <br />September 4, 2007 <br /> <br />