My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008-09-26
Public Access
>
Weekly Updates
>
2008-09-26
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2008 4:47:19 PM
Creation date
9/26/2008 4:47:16 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
? <br /> Police and Fire perform needs assessment on equipment and determine what if <br />any has failed due to damage and make adjustments to continue to respond <br />adequately. <br />? <br /> Fire Chief and City Manager met with Public Works and Park Director to assure <br />all streets will be cleared of major tree and debris. <br />? <br /> Maintain contact with American Red Cross to set up a shelter at Centennial <br />Commons. <br />? <br /> Police Officers monitor several areas without power to secure against looting. <br />? <br /> Police set up portable stop signs at areas where traffic signals were out <br />? <br /> Mayor Adams declares University City in a “State Of Emergency” <br />? <br /> Parks Department Cleans and sanitizes of flood portions of Centennial Commons <br />? <br /> Park Department Opens Centennial Commons as an emergency shelter <br />? <br /> Community Development Department staff responded to multiple properties to <br />perform inspections and made initial preparations to continue inspections and <br />condemnations. <br />? <br /> An emergency inspection number (505-8511) was established for the public to <br />contact and report properties affected by the flood. CD staff were assigned to <br />operate the emergency inspection phone line and coordinate communication <br />between the office and staff. <br />? <br /> PW clears and cleans PW facility, more than 80 vehicles are relocated onto <br />Schnucks lot for evaluation. <br />? <br /> Roll offs (construction dumpsters) are emptied to prepare for Monday delivery. <br />? <br /> PW assists with removal of trees from roadways. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.