Laserfiche WebLink
Session 1920 <br />May 12, 2004 <br /> <br />amount paid to the County for mosquito abatement, and perhaps should have a better <br />title. Employment classifications, jobs, equipment and supplies remain the same. <br /> <br />Ms. Welsch asked about the figure for Education Benefits, and was advised that the <br />figure is lower because there is less employee turnover; 728.05 are for training rather <br />than for higher education tuition fees. The terms were questioned, and it was explained <br />that these words are standard accounting vocabulary. Some travel allocation, it was <br />noted, is used for education programs. There are no major changes in this section. <br /> <br />Street Maintenance - The amount budgeted for over-time and for temporary workers for <br />leaf collection has been reduced because the City changed to a "two-cycle" from a <br />"three cycle" program, and because the schedule has a built-in delay factor, specifically <br />for Thanksgiving week. A few thousand dollars was cut in 714.00 and 721.10. The <br />major change occurs on C-44 under Capital Outlay: each line item here has been cut, <br />because next year's part of the total allocation only, is shown. It is not really a cut; this <br />is the local share. Curb, Sidewalk and Street construction included contingency figures; <br />now the budget shows only the exact amounts, without contingency. IDA, TIF, and <br />LCRA can be approached for funds for streets, only to provide the local share in respect <br />of the Olive Boulevard Enhancement Program; only for specific projects within the <br />jurisdiction of the given agency. Former budgets would have registered those amounts <br />in this section; now they are shown in the IDA, TIF, and LCRA budgets. <br /> <br />Mr. Wagner said the early December leaf pick-up is a big one, so it is necessary to have <br />the "free bag" pick-up available through the month of December. The City Manager said <br />the first two weeks and the final week have been eliminated from the cycles. The City <br />Manager will make sure that citizens know stickers will not be needed on bags for <br />November and December. <br /> <br />The money allocated is for repairs, not for completed repair jobs. The budgeted figure <br />under discussion is for existing streets, curbs and sidewalks, not for completely new <br />jobs. Discussion of the "patch-job" as opposed to a "new-job" followed, and the need for <br />contingency funds was expressed. <br /> <br />On page C-45 line item 711-10 reflects that one employee spends .84 percent of his <br />time on one job, charged here, and then shows the remaining .12 per cent is charged to <br />another department. <br /> <br />PLANNING AND DEVELOPMENT - 26.40 <br /> <br />In order to provide timely service, it is necessary to add two additional positions: one <br />full-time inspector and one full-time clerk typist. The City cannot afford this, so part-time <br />positions have been budgeted for peak times, reflected in the $25,000 amount shown <br />here. Changes to improve the system include: occupancy permits will be available by <br />mail or by telephone; on-line applications will become available; improved telephone <br /> Page 2 <br /> <br /> <br />