My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Demolition requirements
Public Access
>
Community Development
>
Building Permit Requirements
>
Demolition requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2006 3:02:46 PM
Creation date
11/15/2006 3:02:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />DEMOLITION REQUIREMENTS <br />Page 1 <br /> <br />Demolition <br />Permit requirements for of a <br />property <br />: <br /> <br />The following is a list of disconnect notices that the City <br />of University City requires before a building is demolished: <br /> <br /> <br />1. Ameren UE <br />2. Laclede Gas <br />*see special requirement #1 <br />3. Sewer tap destroy (plumbing permit) <br />4. Provide the blue copy of the St. Louis County Demolition Waste hauling permit <br />Provide a copy of the demolition permit authorization form (from the St. Louis <br />County Department of Health). <br /> <br />Special Requirements: <br />* <br /> <br />1. A licensed plumber must be hired to perform the sewer tap destroy. He/she <br />must complete a plumbing permit application and provide proof of license <br />(with St. Louis County). <br />2. The demolition site (depending on the size of the job) may require a <br />barricade until the site is restored to a state of normalcy. <br />
The URL can be used to link to this page
Your browser does not support the video tag.