My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agenda 03-14-2012
Public Access
>
Boards and Commissions
>
Library Board
>
2012
>
Agenda
>
Agenda 03-14-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/15/2012 2:08:59 PM
Creation date
3/15/2012 2:08:58 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Albert Arno provided us with a revised bid for a replacement chiller system at $146,621, 10% over the <br />$133,000 bid from 2010. <br />produce enough energy cost savings to justify the purchase, since there would be an large additional <br />expense for the reconfiguration of the ventilation system throughout the building. They are of the opinion <br />that the current air handlers should last for quite a while and that if and when components fail, those <br />individual components could be repaired, replaced, or even fabricated (if a part was no longer available) <br />for a reasonable amount. Neither man was aware of any renewal of the credit programs that Ameren <br />had offered in 2010-2011. <br /> <br />Missouri Public Library Standards <br />The board will discuss pages one through six of the current version of the Missouri Public Library <br />Standards (www.sos.mo.gov/library/libstan.pdf) <br />understand <br />agreed upon, of librarians pulling for them, but they <br />were not unanimous choices. <br /> <br />Building Issues Update <br />Cooling Components should have the replacement fill for our cooling tower in late March. They will <br />schedule a time to seal the tower once the fill arrives. <br />Ford Asphalt would like to schedule the sealing and re-striping of the parking lot for sometime in April. <br />They will need temperatures to be over 60 degrees for several rain-free days. <br />The relay controlling the second- <br />We had a plumber replace the non-functioning mop-sink faucet by the public restrooms, so that hot <br />water is available for custodial staff. On the advice of the plumber, we also had shut-off valves installed <br />between the water main and the public area of the building, so that we no longer have to shut off all the <br />building <br /> <br />Glossary <br />We will have the requested glossary of frequently used terms and abbreviations available at the board <br />meeting. <br /> <br />EBook update <br />Random House has announced that they will begin charging libraries significantly more than they <br />charge retail customers for eBooks, with increases of up to 300%. <br />The MLC is considering contracting with 3M to provide eBooks, while continuing to subscribe to <br />Overdrive. 3Ms product is still in beta testing, but is supposed to be easier for patrons to use. There is <br />through 3M. <br /> <br />City Council Budget Study Session <br />City Manager Lehman Walker has asked that the Larry and I meet with City Council for a budget study <br />session on Monday, April 23. <br /> <br /> <br />I will have a short presentation ready for the board regarding this past year at UCPL, what we hope to <br />accomplish in the coming year or so, along with our vision the Library. <br />
The URL can be used to link to this page
Your browser does not support the video tag.