My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-02-26 Council Agenda
Public Access
>
City Council Agenda
>
2007
>
2007-02-26 Council Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/23/2007 4:43:20 PM
Creation date
2/23/2007 4:36:38 PM
Metadata
Fields
Template:
Council Meeting
Supplemental fields
Minutes - Date
1/9/2006
SESSIONNUM
1090
TYPE
REGULAR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VERSION 1 <br /> <br /> <br />RESOLUTION <br /> <br />The matter of the neighborhood improvement district in University Hills was considered. <br /> <br />After a review and general discussion of the matter, <br />Councilmember__________________ offered the following resolution and moved its <br />adoption. <br /> <br />BE IT RESOLVED: That the Council of the City of University City, Missouri, finds and <br />declares as follows: <br /> <br /> <br />1. On November 6, 2006, a neighborhood improvement district in University Hills <br />Subdivision (the “Subdivision”) was lawfully established by resolution, and <br />preliminary plans and specifications for the proposed improvement were ordered to <br />be made. <br /> <br />2. The general nature of the proposed improvement is as follows: <br /> Repair and replacement of curbs, gutters and driveway aprons that are <br />a) <br />significantly damaged, non-functional or exhibit more than minor cracks, as <br />determined by the Subdivision Trustees. <br /> Patching, repair and replacement of interface between the street and the <br />b) <br />concrete curbs gutter and driveway aprons in connection with the repair and <br />replacement of such curbs, gutters and driveway aprons and in other areas <br />where crumbling street interface exists, as determined by the Subdivision <br />Trustees. <br /> Selected street patching, repair and resurfacing of depressions, fatigue failure, <br />c) <br />street crowning and rutting, as determined by the Subdivision Trustees. <br /> Application of a new layer of chip seal to all streets, as determined by the <br />d) <br />Subdivision Trustees. <br /> Management and supervision of construction of the improvements listed above <br />e) <br />and maintenance of the improvements listed above during the construction <br />period, to be performed by the Subdivision Trustees. <br /> Application of a future second layer of chip seal to all streets to be performed by <br />f) <br />the Subdivision Trustees, which application shall occur after payment in full of <br />all assessments against the real property within the neighborhood improvement <br />district but within a maximum timeframe of fifteen years. <br /> Establishment of a maintenance fund for the benefit of the Subdivision Trustees <br />g) <br />to provide for the application of a second layer of chip seal to all streets, which <br />application shall occur after payment in full of all assessments against the real <br />property within the neighborhood improvement district but within a maximum <br />timeframe of fifteen years. <br /> <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.