My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6271
Public Access
>
City Council Ordinances
>
2000
>
6271
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2004 2:48:50 PM
Creation date
11/5/2014 12:22:38 PM
Metadata
Fields
Template:
City Ordinances
Passed
10/30/2000
Ordinance Number
6271
Bill Number
8494
Introdate
10/16/2000
Description
Approving agreement between the City and Axon Telecom to install underground cable
Introduced By
Colqitt
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. Grant. The City hereby grants to Axon the nonexclusive right, privilege, and <br />license for the Construction, Maintenance, and Removal of the Facilities under any and all Public <br />Ways during the Term. Both parties recognize that said grant does not authorize Axon to provide <br />cable television services or open video services, as defined pursuant to 47 U.S.C. Section 573, <br />within the corporate limits of the City. Except as otherwise provided in this Agreement, Axon <br />shall bear the entire cost and expense of all Construction, Maintenance, and Removal of the <br />Facilities and Axon shall hold the City harmless thereon. The route shall be as set out in the map <br />attached hereto as Exhibit A and incorporated herein, unless otherwise amended in writing <br />signed by both parties. <br /> <br /> 3. Constrnetion. Axon may effect Construction of the Facilities (or any part <br />thereof) on the Public Ways only after approval thereof has been given, or deemed given, by the <br />City Director of Public Works, which approval shall not be unreasonably withheld. The City <br />Director of Public Works shall notify Axon in writing of his or her approval or disapproval of the <br />proposed construction of the Facilities in the Public Ways within forty-five (45) days after <br />delivery by Axon to the City Director of Public Works of plans and specifications therefor. <br />Axon agrees that Construction of the Facilities in the Public Ways shall be done in such locations <br />and in such manner so as not to unreasonably interfere with existing water, gas, sewer pipe, <br />traffic signal, street light and other utilities and conduits in the Public Ways. All Construction <br />shall be underground. Axon shall comply with all reasonable directions of the City Director of <br />Public Works in connection with Construction of the Facilities. The City Director of Public <br />Works shall have full access to all portions of the Facilities and may issue stop work orders and <br />corrective orders to prevent unauthorized work; provided, however, that the Director shall first <br />provide Axon reasonable notice prior to such access and allow an Axon employee or agent to <br />accompany the Director at the time of such access. Unless this Agreement provides otherwise, <br />Axon may construct, maintain and/or remove Facilities necessary, to provide services to its <br />customers or to interconnect with other telecommunications provider facilities without prior <br />consent from the City, but Axon will obtain all necessary permits and authorizations from the <br />City Director of Public Works prior to commencing any Construction; Removal; or Maintenance <br />which disturbs or blocks vehicular traffic in the Public Ways. <br /> <br />4. Maintenance and Safe .ty Requirements. <br /> <br />Axon shall: <br /> <br />(a) At all times employ the highest degree of care and shall use commonly <br /> accepted methods and devices for preventing failures and accidents which are <br /> <br />-2- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.