Laserfiche WebLink
Bo <br /> <br />inspection, shall be charged at the rate of twenty-eight dollars and fifty cents <br />($28.50) per hour or fraction of an hour. <br /> <br />An additional fee of fiRy-seven dollars ($57.00) shall be charged for the issuance <br />of temporary certifications of occupancy. <br /> <br />Fee Schedule. <br /> <br />1. Construction, alteration, additions, repairs or the moving of a structure: <br /> <br />Construction Cost <br /> <br />Permit Fee <br /> <br />Up to $10,000.00: <br /> <br />$17.10 per $1,000.00 of construction cost <br /> <br />$10,000.00 to $400,000.00: <br /> <br />$114.00, plus $5.70 per $1,000.00 of <br />construction cost <br /> <br />$400,000.00 to $1.5 million: <br /> <br />$570.00 plus $4.56 per $1,000.00 of <br />construction cost <br /> <br />$1.5 million and up: <br /> <br />$2,280.00 plus $3.42 per $1,000.00 of <br />construction cost <br /> <br />2. Signs: <br /> <br />Temporary promotional displays erected <br />Plus, cash bond to ensure code compliance <br /> Wall signs erected, constructed, painted, <br />altered or enlarged (based on gross sign area) <br />as follows: <br />Under 40 square feet <br />40 to 80 square feet <br />Over 80 square feet <br /> Freestanding signs, roof signs, or canopy <br />signs erected, constructed, painted, altered or <br />enlarged (based on gross sign area) as follows: <br />Under 40 square feet <br />40 to 80 square feet <br />Over 80 square feet <br /> <br />$ 11.40 <br /> 57.00 <br /> <br /> 28.50 <br /> 57.00 <br />114.00 <br /> <br /> 57.00 <br />114.00 <br />171.00 <br /> <br />3. Fire suppression system: <br />Sprinkler systems, per head <br />Other extinguishing systems, per head <br />Standpipe riser, per floor <br /> <br />2.28 <br />2.28 <br />11.40 <br /> <br />3 <br /> <br /> <br />