<br /> <br /> <br /> <br /> <br /> <br /> Exception: Construction documents otherwise meeting the requirements of this Section which <br /> are submitted for a project, the details of which otherwise conform to the requirements of this <br /> code, but whose documented estimated cost does not exceed $25,000, need not have a design <br /> professional's stamp affixed. The issuance of a permit based on such documents does not relieve <br /> their originator from otherwise complying with applicable state laws concerning professional <br /> practice by unlicensed individuals. When the documented project cost estimate exceeds $25,000, <br /> or where special conditions exist, the building official will require the submittal of construction <br /> documents prepared by a registered design professional, as indicated by his or her stamp and <br /> signature or their authorized facsimiles appearing on each document in accordance with <br /> applicable state laws. <br /> 106.2.1 Grading and drainage. The site plan shall provide sufficient detail to determine <br /> compliance with site grading and storm water drainage provisions of this code and of applicable <br /> ordinances for the control, drainage and discharge of storm water. <br /> <br /> 106.3.1 Approval of construction documents. Delete in its entirety. <br /> <br /> 106.3.4.3 Visits to site. When so directed by the building official or when required by the special <br /> inspection provisions of this code, the registered design professional shall make visits to the site <br /> at intervals appropriate to the stage of the construction components requiring controlled <br /> materials; or to determine whether the work is proceeding in accordance with the construction of <br /> documents approved for the building permit. The registered design professional shall <br /> periodically submit reports to the building official showing the results of such periodic visits. <br /> <br /> (SECTION 108 FEES) <br /> <br /> 108.4 Surcharge for work started without a permit. In case any work for which a permit is <br /> required by this code is substantially started or proceeded without first obtaining said permit, the <br /> total normal fees applicable shall be increased by an amount equal to the permit fee; except that <br /> the surcharge amount shall not be less than $25.00 nor more than $500.00 for each permit. <br /> <br /> (SECTION 109 INSPECTIONS) <br /> <br /> 109.3.90 Extra inspections. In addition to the inspections normally provided, the building <br /> official shall require that additional inspections or reinspections be conducted due to <br /> noncompliance with code requirements or due to work which is not ready for inspection or not <br /> accessible for inspection at the time of a scheduled inspection. Fees for such additional <br /> inspections shall be assessed and paid prior to scheduling the next inspection. <br /> <br /> 109.4 Inspection agencies. The building official is authorized to accept reports of approved <br /> inspection agencies, provided such agencies satisfy the requirements as to qualification and <br /> reliability. All such reports must be received by the Department of Community Development <br /> within 72 hours of the inspection or as approved by the building official. All fees and costs <br /> related to the performance of special inspections services shall be the responsibility of the owner. <br /> <br /> <br /> <br /> <br /> 5 <br />