Laserfiche WebLink
Session 1498, M/nutes Page 2 <br />J~e 19, 1989 <br /> <br />P~-trocm P~modelinq. Invitations to bid on remodeling two restrocm~ at the <br />~ut/h Park Clubhouse were sent to 31 contractors, with the following response: <br /> <br />A. Brooks OaL~any, Inc. $ 6,995 <br />L~ppincott Construction Co. (substitute <br />liner paper on walls instead of new <br />drywall per bid specifications) 10,175 <br />Lippinoott (kx,~truction OD. 10,383 <br />Appleba~ & Associates, Inc. 10,487 <br />A. Brooks O-.~ny, Inc. (inc~l~ ~- <br />merits not in bid specificatior~) 10,745 <br />Richco ~ion, Inc. 11,633 <br /> <br />Accegtance of the alternat~ bid of $9,820 fz~L, A. Brooks Cc~pany, Inc. less <br />two of the enhancements ~re~_'~,u~nded (new vinyl floors, $550; larger vanities, <br />$375) was rec~Lmer~_ed. <br /> <br />Bids for Vaomam Leaf Loader. Invitations to bid on furnishing a vacuum leaf <br />loader for the Street Division were sent to five suppliers, with the following <br />response: <br /> <br />EcoSystems, Inc.--Giant Vac Model ~-6800 <br /> Options: Curb nozzle ass~nbly + $ 795 <br /> T~f eater assembly + 1,495 <br /> ~-~y rider sulky + 1,795 <br /> <br />$ 6,995 <br /> <br />Key Equipment Co.--AmericanRoadModel 885-1 8,998 <br /> <br />Winning Equipment Co.--Ford Model 710 <br /> <br />25,250 <br /> <br />Because of problems with dust and debris f~ the vacuum syst~ getting into <br />the power unit and causing it to overheat, the Street Division specifications <br />called for a steel housing to be located_ between the power unit and the truck <br />container. Only the American Road leaf loadar f£~, Key Equipment meets this <br />specification. In addition to the basic unit, Key Equipment has offered a <br />curb nozzle for $250. Therefore, it was rec~,mended that the bid of $9,248 <br />(leaf loader plus curb nozzle) fa~ Key Equilxaent be accepted. Budget alloca- <br />tion for th/s equipment is $9,600. <br /> <br />Bids for Salt Spreaders. Invitations to bid on fur~hing and installing two <br />salt spr~ers for the Street Division were sent to the two known suppliers, <br />with the following response: <br /> <br />C~,uanv Unit Price Total <br /> <br />Kranz Autc~otive Body CO. $4,211 <br />~wson Model 510, 5.7 cu.yd. <br />Tr~ck Eq%/i~a~ent CO. 4,261 <br />Fontai~e Model "E", 6.3 c~.yd. <br />Kranz Automotive Body Co. 4,842 <br /> Hi-Way Model E-2020, 5.8 cu.yd. <br /> <br />$8,422 <br /> <br /> 8,522 <br /> <br /> 9,684 <br /> <br /> <br />