My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Centennial Greenways
Public Access
>
Boards and Commissions
>
Plan Commission
>
2023 Comprehensive Plan
>
Archive (2015 Incomplete Update)
>
Comprehensive Plan Update - 2015 to present
>
Past Plans
>
Centennial Greenways
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2015 5:07:59 PM
Creation date
11/25/2015 5:07:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
As the Centennial Greenway nears Interstate 270, it will follow the east side of Orchard Lakes Drive right-of-way to the south about one block to the City of St. Louis Water right-of-way. <br />Turning west, the Centennial Greenway will cross I-270 via a pedestrian bridge. The grade on the east side of I-270 is considerably higher than the road surface creating a logical place <br />for a bridge to be located. The bridge will cross I-270, and land in Water right-of-way on the west side of the highway. The bridge <br />should incorporate structural design elements and limestone monuments at the landings to signify the Centennial Greenway. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.