My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Centennial Greenways
Public Access
>
Boards and Commissions
>
Plan Commission
>
2023 Comprehensive Plan
>
Archive (2015 Incomplete Update)
>
Comprehensive Plan Update - 2015 to present
>
Past Plans
>
Centennial Greenways
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/25/2015 5:07:59 PM
Creation date
11/25/2015 5:07:52 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
108
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Centennial Greenway will follow City of St. Louis Water and Ameren rights-of-way for over two miles from I-270 to Fee Fee Road. As the alignment continues west, rest areas and native <br />landscape materials will be implemented at appropriate locations to screen and buffer adjacent uses. Existing small bridges over creek channels may be used but will be improved to better <br />As the Centennial Greenway approaches Fee Fee Road, secondary connections should be developed to link to Parkway North High School. It will pass under Fee Fee Road by passing through <br />one of two box culverts in the creek channel, following the City of St. Louis Water right-of-way and reconnect with the Ameren corridor. A low wall should be included of an appropriate <br />height to separate trail from river channel during minor storm events while allowing larger storm flows in both culverts. The design of the Centennial Greenway through the culvert and <br />near the creek will require coordination and approval from the Corps of Engineers, Metropolitan St. <br />Louis Sewer District and St. Louis County. <br />accommodate pedestrian movement. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.