Laserfiche WebLink
EPA GPC Requirements -#1 <br />•The Hybrid proposal is to buy 5 blocks (RECs) per month from <br />Pure Power to support the local program and receive local <br />recognition <br />–Ameren Missouri Pure Power Supports the development of 100% <br />Missouri Wind Power, no contract required. The monthly cost is added <br />to existing Ameren account <br />•The other 41 blocks are 3Degrees US Green Power RECS. <br />These are national RECs for any US located facility, using any <br />type of renewable energy. There is an annual contract and <br />prices can vary annually.