My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-16 Meeting Minutes GPC
Public Access
>
Boards and Commissions
>
Green Practices Commission
>
Agendas and Minutes
>
Minutes and Agendas 2016
>
03-10-16 Meeting Minutes GPC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 2:45:56 PM
Creation date
5/6/2016 5:28:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
EPA GPC Requirements -#1 <br />•The Hybrid proposal is to buy 5 blocks (RECs) per month from <br />Pure Power to support the local program and receive local <br />recognition <br />–Ameren Missouri Pure Power Supports the development of 100% <br />Missouri Wind Power, no contract required. The monthly cost is added <br />to existing Ameren account <br />•The other 41 blocks are 3Degrees US Green Power RECS. <br />These are national RECs for any US located facility, using any <br />type of renewable energy. There is an annual contract and <br />prices can vary annually.
The URL can be used to link to this page
Your browser does not support the video tag.