My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03-10-16 Meeting Minutes GPC
Public Access
>
Boards and Commissions
>
Green Practices Commission
>
Agendas and Minutes
>
Minutes and Agendas 2016
>
03-10-16 Meeting Minutes GPC
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2018 2:45:56 PM
Creation date
5/6/2016 5:28:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
Show annotations
View images
View plain text
EPA GPC Requirements -#1 <br />City itself becomes a Green Power Partner <br />•University City purchases RECs at Gold Leader level (EPA Green Power Partner level) <br />Annual Electricity Usage for City Facilities: 5,503,517 kWh <br />Green Power Partnership Requirement = 10% = 5,504 MWh = 46 Blocks/ month or 552 Blocks <br />(RECs) / year <br />Original Option: Ameren Missouri Pure Power Only <br />46 blocks/ month * $10 / block = $460 / month or $5,520 /year <br />New Hybrid Option: Hybrid of Pure Power and 3Degrees US Green Power RECs <br />5 blocks of MO Pure Power ($10 each) = $50 /month or $600 / year <br />41 blocks of US Green Power Recs ($1.50 each) = $738 / year <br />New Hybrid Option cost: $1,338 / year THIS NEW PLAN IS 75% CHEAPER <br />•City is already collecting Utility taxes on existing Pure Power enrollments, and the additional <br />enrollments that would be added during the Challenge would likely cover the direct cost for the <br />City to become an EPA Green Power Partner.
The URL can be used to link to this page
Your browser does not support the video tag.