Laserfiche WebLink
EPA GPC Requirements -#1 <br />City itself becomes a Green Power Partner <br />•University City purchases RECs at Gold Leader level (EPA Green Power Partner level) <br />Annual Electricity Usage for City Facilities: 5,503,517 kWh <br />Green Power Partnership Requirement = 10% = 5,504 MWh = 46 Blocks/ month or 552 Blocks <br />(RECs) / year <br />Original Option: Ameren Missouri Pure Power Only <br />46 blocks/ month * $10 / block = $460 / month or $5,520 /year <br />New Hybrid Option: Hybrid of Pure Power and 3Degrees US Green Power RECs <br />5 blocks of MO Pure Power ($10 each) = $50 /month or $600 / year <br />41 blocks of US Green Power Recs ($1.50 each) = $738 / year <br />New Hybrid Option cost: $1,338 / year THIS NEW PLAN IS 75% CHEAPER <br />•City is already collecting Utility taxes on existing Pure Power enrollments, and the additional <br />enrollments that would be added during the Challenge would likely cover the direct cost for the <br />City to become an EPA Green Power Partner.