My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2007-09-24 Agenda
Public Access
>
City Council Agenda
>
2007
>
2007-09-24 Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2007 9:57:43 AM
Creation date
9/24/2007 9:35:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
80
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />The Sutter-Meyer farmhouse requires major work. The building needs: <br /> <br />? <br /> <br />two chimneys. The chimneys on the building collapsed during wind and <br />rainstorms during the past two years; <br />? <br /> <br />extensive plastering throughout the building; <br />? <br /> <br />spot tuckpointing on the outside of the building and on the hearth in the <br />living room; <br />? <br /> <br />plywood and asbestos-laden vinyl tile removal from the second floor <br />bedrooms; <br />? <br /> <br />refinished floors throughout the second floor; <br />? <br /> <br />refinished stairs from the main to the second floor; <br />? <br /> <br />shoring up of the kitchen floor, which has sunk a number of inches over <br />the years; <br />? <br /> <br />replacement of flooring on the first floor. The old pine flooring has been <br />worn and improperly sanded to a thickness of only 5/8”, with extensive <br />patching needed throughout; <br />? <br /> <br />new HVAC systems so that proper temperature and moisture control can <br />be maintained throughout the building; <br />? <br /> <br />patching on the roof to stop a leak into the kitchen and added-on <br />bathroom; <br />? <br /> <br />painting throughout the interior and exterior; <br />? <br /> <br />spot electrical updating throughout the building; <br />? <br /> <br />repair and/or replacement of sump pump in basement; <br />? <br /> <br />installation of accessible bathroom facilities; <br />? <br /> <br />some non-invasive retrofitting to make first floor of building fully- <br />accessible; <br />interior storm windows to make the building more energy-efficient, while protecting <br />the integrity and view of the historic windows throughout the building. <br /> <br />K-1-g <br />September 24, 2007 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.