Laserfiche WebLink
Zoning Variance <br />A variance to allow a reduction in the width of the required landscape buffer between the <br />proposed parking and public right-of-way along Delcrest Drive was granted by the Board of <br />Adjustment on October 21, 2013. The variance was approved to allow a five foot landscape <br />buffer in lieu of the ten feet required per the Zoning Code. <br />PD –M–Planned Development Mixed Use <br />The property was rezoned to PD-M in 2013, and a preliminary and final development plan <br />were approved for the property. The PD-M zoning designation as per Section 34-40.1 of the <br />Zoning Code is “to provide a means of achieving greater flexibility in development of land in a <br />manner not always possible in conventional zoning districts; to encourage a more imaginative <br />and innovative design of projects; to promote a more desirable community environment; and to <br />retain maximum control over both the design and future operation of the development.” The <br />PD-M rezoning was sought because the facility proposed to allow a café and other accessory <br />uses that would be open to residents and the general public. These uses were not allowed by <br />the prior traditional zoning district regulations. <br />Planned Development Districts are attached to a parcel, and may only be developed in <br />accordance with an approved development plan. The development plan approved in 2013 <br />included renovations to the senior living facility, he addition of a ground floor café and <br />substantial reconfiguration of the parking areas. There were no modifications to the upper <br />floor residential areas or the number of units, density, height or mass. <br />Applicant’s Request <br />Zoningand Land Use <br />The applicant is requesting an amendment to the approved development plan to allow for the <br />reconstruction of 120 housing units on the existing site in two phases. <br />After concludingthat the 1960s constructed multi-family complex (“Tallin Building”)was poorly <br />designed, functionally obsolete and didnot meet modern standards and codes, the developers <br />explored several options for the building. It was determined that renovating the existing <br />structure was extremely cost prohibitive, problematic, and limiting.New construction is being <br />pursued. <br />Phase 1 includes a 4-story 52 unit building over parking garage. This building is proposed for <br />the western portion of the property. Phase 2 includes the construction of a4-story 68unit <br />buildingbuiltover a podium parking garage. The proposed siting of the Phase 2 building is <br />immediately north of the Tallin Building, and 30feet south of the northern property line.Phase <br />2also includes a connected one story office building for management and administrative <br />offices. <br />The proposal representssignificant changes to the development plan approved in 2013. <br />Therefore, a plan amendment process is required. In addition to the demolition of the Tallin <br />Building and construction of the new buildings, some of the off-street parking areas will be <br />reconfigured. Specifically, the remaining surface area once the Tallin Building is demolished <br />will be converted to surface parking. Much of the surface parking to the east will remain.No <br />new curb cuts are proposed. <br />The proposed additions, modifications and reconfiguration of the parking areas will result in <br />3 <br /> <br />