Laserfiche WebLink
CHAPTER 6 – TRANSPORTATION AND MOBILITY <br /> Ensure the phrase “word diet” is removed; substitute with “enhancement” <br /> Include private street information, including maintenance responsibility, in the Roadway <br />Network summary. <br /> Make corrections to the Transportation Framework Plan Map (as indicated on Ray Lai’s <br />hard copy). <br /> Regional Mobility <br />th <br /> Revise the 4 bullet point to remove local street names and add “…where <br />o <br />appropriate from a land use and traffic perspective, and so desired by the <br />community.” <br /> Insert the words “Continue to…” at the beginning of bullet points 1, 2, 3, and 5. <br />o <br /> Local Connectivity and Safety <br /> In the first bullet point, substitute the word “consider” for “implement”. <br />o <br />th <br /> bullet points. <br /> Remove the third and 5 <br />o <br /> Add a bullet point “ As infrastructure and physical enhancements are planned for <br />o <br />the Olive Boulevard corridor, ensure the needs of businesses, patrons and all <br />forms of transportation are considered and appropriately balanced. <br /> Olive Boulevard Road Diet <br /> Eliminate section <br />o <br /> Parking Management <br /> Add street labels to aerial photographs, zoon in <br />o <br /> Substitute enhancement for road diet in section <br />o <br /> Add the following bullet points to the Delmar Loop parking study <br />o <br />recommendation: “Measure to ensure the safety and security of parking <br />patrons.” “Ensure that new parking facilities are compatible in mass, scale and <br />context with the surrounding area, and incorporate sustainable design and <br />construction. <br /> Sixth bullet point, remove word “structure” and substitute “additional” for <br />o <br />“potential” <br /> Delete bullet point beginning with “Incentivize the creation…” on p. 45. <br />o <br /> Bike Walk <br /> Make corrections to the Bicycle and Pedestrian Framework Plan Map (as <br />o <br />indicated on Ray Lai’s hard copy) <br /> p. 46 correct the typo “additional” <br />o <br /> Eighth bullet point, add “where feasible and desired by the community” to the <br />o <br />end of the sentence. <br /> Transit Mobility <br /> Revise the Transit Framework Plan to include the narrative description of the bus route; <br />o <br />depict the correct location of the green line <br />th <br /> Transit Recommendations – to the 6 bullet point add “consider expanding to Olive <br />Boulevard” <br />Ќ <br /> <br />