My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-06 Regular Council Meeting Agenda
Public Access
>
City Council Agenda
>
2009
>
2009-04-06 Regular Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2009 10:45:44 AM
Creation date
4/3/2009 10:45:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(SECTION R321 SITE ADDRESS) <br />R321.1 Premises identification. <br /> All improved properties shall be numbered according to <br />Section 190 of the Building Code of University City. <br />SECTION R324 FLOOD-RESISTANT CONSTRUCTION <br />() <br />R324.90 Certified elevations <br />. Any building to be constructed in a flood hazard zone, other than <br />alterations or additions to existing one-or two-family dwellings, shall have the low sill elevation <br />certified by a Registered Engineer or Land Surveyor who is licensed in the State of Missouri, <br />before approval of the required foundation inspection shall be given. <br />(SECTION R390 CONSTRUCTION SAFEGUARDS) <br />R390.1 Temporary construction fencing. <br />Construction fencing shall be installed as applicable <br />with section 3390 of the Building Code of University City. <br />(SECTION R391 CONSTRUCTION SITE SANITARY FACILITIES) <br />R391.1 Construction site sanitary facilities. <br />Any new construction, additions, alterations, <br />and/or construction-like activities shall require job-site toilet facilities. These activities shall <br />include, but shall not be limited to, all new construction, remodeling, long-term excavation, long- <br />term demolition, additions, etc. <br />R391.2 General. <br />All portable toilets installed must comply with ANSI Z4.3. Job-site toilets <br />must be available at the start of the project. The building official will notify the contractor if a <br />portable toilet is required for the project during the plan review process. <br />R391.3 Location. <br />All portable toilets must be located with the confines of the construction site. <br />R391.4 Maintenance. <br />Facilities must be maintained in a sanitary condition during the course of <br />the project and in accordance with ANSI Z4.3. <br />R391.5 Removal. <br />All portable toilets must be removed prior to the final inspection. <br />(SECTION P2690 STORMWATER) <br />P2690.1 Residential storm water. <br /> Storm drainage from residential properties governed by this <br />code shall comply as applicable to the storm drainage provisions of Chapter 11 of the Plumbing <br />Code of University City. <br />9 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.