My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-04-06 Regular Council Meeting Agenda
Public Access
>
City Council Agenda
>
2009
>
2009-04-06 Regular Council Meeting Agenda
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/3/2009 10:45:44 AM
Creation date
4/3/2009 10:45:22 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Exception: <br /> Construction documents otherwise meeting the requirements of this Section which <br />are submitted for a project, the details of which otherwise conform to the requirements of this <br />code, but whose documented estimated cost does not exceed $25,000, need not have a design <br />professional’s stamp affixed. The issuance of a permit based on such documents does not relieve <br />their originator from otherwise complying with applicable state laws concerning professional <br />practice by unlicensed individuals. When the documented project cost estimate exceeds $25,000, <br />or where special conditions exist, the building official will require the submittal of construction <br />documents prepared by a registered design professional, as indicated by his or her stamp and <br />signature or their authorized facsimiles appearing on each document in accordance with <br />applicable state laws. <br />106.2.1 Grading and drainage. <br /> The site plan shall provide sufficient detail to determine <br />compliance with site grading and storm water drainage provisions of this code and of applicable <br />ordinances for the control, drainage and discharge of storm water. <br />106.3.1 Approval of construction documents. <br /> Delete in its entirety. <br />106.3.4.3 Visits to site. <br /> When so directed by the building official or when required by the special <br />inspection provisions of this code, the registered design professional shall make visits to the site <br />at intervals appropriate to the stage of the construction components requiring controlled <br />materials; or to determine whether the work is proceeding in accordance with the construction of <br />documents approved for the building permit. The registered design professional shall <br />periodically submit reports to the building official showing the results of such periodic visits. <br />SECTION 108 FEES <br />() <br />108.4 Surcharge for work started without a permit. <br /> In case any work for which a permit is <br />required by this code is substantially started or proceeded without first obtaining said permit, the <br />total normal fees applicable shall be increased by an amount equal to the permit fee; except that <br />the surcharge amount shall not be less than $25.00 nor more than $500.00 for each permit. <br />SECTION 109 INSPECTIONS <br />() <br />109.3.90 Extra inspections. <br /> In addition to the inspections normally provided, the building <br />official shall require that additional inspections or reinspections be conducted due to <br />noncompliance with code requirements or due to work which is not ready for inspection or not <br />accessible for inspection at the time of a scheduled inspection. Fees for such additional <br />inspections shall be assessed and paid prior to scheduling the next inspection. <br />109.4 Inspection agencies. <br /> The building official is authorized to accept reports of approved <br />inspection agencies, provided such agencies satisfy the requirements as to qualification and <br />reliability. All such reports must be received by the Department of Community Development <br />within 72 hours of the inspection or as approved by the building official. All fees and costs <br />related to the performance of special inspections services shall be the responsibility of the owner. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.