Laserfiche WebLink
Session 1221, Minutes <br />June 18, 1979 <br /> <br />Page 8 <br /> <br />CONSIDERATION OF BIDS FOR CONCRETE, .S~ND.~ CE2fENT AND HARKING LI~qE (continued) <br /> <br />Sand <br /> <br />Picked up: <br /> 300 tons Mississippi sand (F.O.B., St. Louis foot of Davis St.) <br /> 300 tons Mississippi sand (F.O.B., 8050 }~nchester) <br /> <br />$2.25/ ton <br />6,50/ ton <br /> <br />Delivered: <br /> 7 tons Mississippi sand (minimum) <br /> 16 tons Mississippi sand (minimum) <br /> <br />7.85/ ton <br />6.85/ ton <br /> <br />10 tons Meramec sand (F.O.B., 8050 ~nchester) <br />10 tons Meramec sand (Delivered at one time) <br /> <br />7.35/ ton <br />9.00/ ton <br /> <br />Cement <br /> <br />190 sacks regular <br />10 sacks H.E.S. <br /> <br />$4.50 per sack, picked up <br />5.00 per sack, picked up <br /> <br />$5.50 per sack, delivered <br />6.00 per sack, delivered <br /> <br />Marking .Lime <br /> <br />400 sacks (50 lb. each) 2.54 per sack, picked up <br /> <br />3.54 per sack (30) del. <br />3.25 per sack (100) del. <br /> <br />Breckenridge Material Company, the successful bidder this year~ showed price differ- <br />entials .as follows: ready-mix concrete is 19% higher next year, H.E.S. concrete is <br />26% higher, Mississippi River sand has increased $ .50 per ton for picked-up and <br />$2.10 per ton delivered, and Meramec sand, regular and HoE.S. cement and marking <br />lime have increased from $ .90 to $ .94 per unit on both delivered and picked-up <br />prices. The total for all items is approximately $13,000. <br /> <br />CONSIDERATION OF BIDS FOR GASOLINE AND DIESEL OIL (#6) <br /> <br />Twenty suppliers were invited to bid on the City's 1979-80 requirements of diesel <br />oil and gasoline, estimated to be 84,500 gallons of regular gasoline, 102,000 gal- <br />lons of non-leaded gasoline and 14,500 gallons of'#1 diesel fuel. Two bids were sub- <br />mitred, as follows: <br /> <br />~e8ular Unleaded <br /> <br />#1 Diesel Fuel <br /> <br />C. M. Spiegel <br />Quickheet Heating <br /> <br />$ .6313 $ .6563 $ .7500 -- -- .709 <br /> <br />The administrative forces recommend that the C. M. Spiegel bids on regular and un- <br />leaded gasoline be accepted, and the award for #1 diesel fuel go to Quickheet Heat- <br />ing. All prices are subject to escalation. (Last year's prices were $ .4345 per <br />gallon for regular, $ .4575 per gallon for unleaded and $ .4250 per gallon for #1 <br />diesel fuel.) <br /> <br />CONSIDERATION OF BIDS FOR ASPMALTIC PRODUCTS,,~#7) <br /> <br />Three companies submitted bids for the City's 1979-80 requirements of asphaltic prod- <br />ucts, estimated to be 500 tons of asphaltic concrete mixture, and 60,000 gallons <br />cationic emulsion, as follows: <br /> <br /> <br />