Laserfiche WebLink
- Loop parking meter time limit extension from two to four hours was approved by City Council <br />October 4, 2010. Implementation plan in progress to reprogram meters in the Loop area. <br />- One stop sign on Teasdale Ave, at Central Ave. and one stop sign on Washington Avenue at <br />Bemiston Avenue were installed October 6, 2010. <br />- Traffic Commission Annual report amended. <br /> <br />6. FYI - Westview Ave/Mapleview Ave ADA update. <br /> <br />The City is being required by the Missouri Department of Transportation and the Federal Highways <br />Administration to make the sidewalk/island accessible due to an ADA complaint from a resident in the <br />neighborhood. Please refer to attached memorandum from Public Works for detailed information. <br /> <br />The installation of two warning signs south of the sidewalk/island location on each street (Westview <br />Drive and Mapleview Drive) will be part of the implementation process. The signs should read “Share <br />the Road”. <br /> <br />Former <br />Street/now <br />parking lot <br />Raised island <br /> <br />Sidewalk/Island to <br />be made accessible <br /> <br /> <br />Cc: Evelyn Benford, Director of Public Works <br /> Captain Michael Ransom, Police Department <br /> Terry Crow, Council Liaison <br />