My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change of Use requirements
Public Access
>
Community Development
>
Building Permit Requirements
>
Change of Use requirements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/4/2006 12:15:12 PM
Creation date
11/15/2006 2:50:00 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Change of Use <br />Page 2 <br />4. Fire protection systems include sprinklers, detectors, pull stations, alarms, etc... <br />5. The information with the permit should describe the existing mechanical, electrical and <br />plumbing systems and any upgrades. <br />6. The following accessibility features must be present: <br />a. An accessible building entrance <br />b. An accessible route from an accessible building entrance to primary function <br />areas. <br />c. Signage <br />d. Accessible parking, where parking is provided. <br />e. At least one loading zone (when loading zones are provided) <br />f. An accessible route connecting accessible parking and accessible passenger <br />loading zones to an accessible entrance. <br />7. Exterior conditions refer to proposed or existing parking. <br />**Note: Where it is technically infeasible to comply with the new construction <br />standards for any of these requirements for a change of use, the items shall conform <br />to the requirements to the maximum extent technically feasible. Refer to the code <br />section below (Section 3409.6 of the International Building Code’03): <br /> <br /> <br />?? <br />Change of Use Requirements (based on the International Building Code ‘03) October 30, 2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.