My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6467
Public Access
>
City Council Ordinances
>
2003
>
6467
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2004 2:50:08 PM
Creation date
11/5/2014 12:24:02 PM
Metadata
Fields
Template:
City Ordinances
Passed
12/15/2003
Ordinance Number
6467
Bill Number
8699
Introdate
12/1/2003
Description
Amdg Chap 12:04 by repealing 12.04.070 right of way management to impose duities and obligations on all users of city's rights of way
Introduced By
Sharpe
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Right-of-Way Permit Fee Schedule <br /> <br />Right-of-Way Permit Filine Fee $50.00 . <br />This is a nonrefitndable adtninistrationfee for all right-of-way permits. This fee covers the <br />cost of issuing, processing and verifying right-of, way permit applications, except for banners, <br />which the City shall charge $25.00 per application, plus $10 per banner. Additional fees may <br />apply (see below schedule of fees). <br /> <br />Excavation Fee $1.50 per sq.ft.of area <br />For excavations only, each permit applicant is required to pay a minimum fee per square foot of <br />fight-of-way excavated, to cover inspections, site visits, administration, management and <br />restoration costs. <br /> <br />Additional Riffht-of-Way Management Permit Fees <br />In addition to the Right-of-Way Permit filing fee, for each permit the City charges certain fees to <br />cover the costs associated with managing its public rights-of-way, as follows: <br /> 1. Expedited Application Fee $40.00 per hour <br /> Permit applications require 30 days to review. Requests to issue a <br /> permit without 30 days of revieW time are considered expedited. <br /> A fee is applied per hour of review. <br /> 2. Permit Time Extension Before (30) Day Expiration $25.00 <br /> Permits are valid for 30 days, unless additional time is requested <br /> at the time of filing. Permit time extensions are subject to a fee. <br /> 3. Permits Time Extension After (30) Day Expiration $50.00 <br /> Permits are valid for 30 days, unless additional time is requested <br /> at the time of filing. Permit time extensions are subject to a fee. <br /> 4. Review of Project/Site Plans $1.00 per page <br /> Up to 5 pages are included in the permit application fee. <br /> For any plan over 5 pages, this fee is applied per page <br /> 5. Traffic Control Plans $1.00 per page <br /> Up to 5 pages are included in the permit application fee. <br /> For any plan over 5 pages, this fee is applied per page <br /> 6. Inspection/Job Site Visit Fee Per Occurrence $25.00 <br /> For all permits, other than excavation permits, <br /> the permit applicant is required to pay a minimum <br /> inspection/site visit fee per occurrence. <br /> Includes inspections Monday- Friday from 8a.m. - 5p.m. only. <br /> 7. Overtime Inspection/Job Site Visit Fee <br /> For any inspection performed beyond normal work hours. $40.00 per hour <br /> For any inspection performed on weekends/holidays. $70.00 per hour <br /> <br />Right-of-Way Permit Deposits & Bonds: <br />To ensure that fight-of-way is restored to the City's specifications, the following deposit and <br />bond amounts are required: <br /> <br />OcCupation/Blockage of Right-of-Way: Minimum Deposit - $250.00/Minimum Bond <br />$3,000.00 <br /> <br />10 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.