Laserfiche WebLink
Includes placing any of the following on right-of-way: construction dumpsters, equipment and <br />materials (trucks, back hoes, cranes, dirt/gravel, etc.) or blockage of right-of-way for 4 hours or <br />longer. Also includes new construction projects where heavy equipment may damage the right- <br />of-way during cOnstruction. <br /> <br />Excavation or Borings in Right-of-Way: Deposit and Bond - varies on case- by-case basis. <br />The deposit and bond amounts are based on the City's estimate to restore the area(s) disturbed. <br />The exact fee will depend on the total volume and type(s) of area(s) disturbed. <br /> <br />Improvements to Sidewalks, Driveways, and Curbs - Minimum Deposit $250.00/Minimum <br />Bond $1000.00. <br /> <br />11 <br /> <br /> <br />