Laserfiche WebLink
(CHAPTER 31 SPECIAL CONSTRUCTION) <br /> (SECTION 3107 SIGNS) <br /> 3107.90 New signs. A sign shall not hereafter be erected, constructed, altered or painted except as <br /> herein provided and not until after a permit has been issued by the Building Official with the approval <br /> of the Zoning Administrator. <br /> 3107.91 Permit Exemption. A permit shall not be required for signs which are exempt from the <br /> provisions of the Zoning Code of University City. <br /> (CHAPTER 33 SAFEGUARDS DURING CONSTRUCTION) <br /> (SECTION 3390 TEMPORARY CONSTRUCTION FENCES) <br /> 3390.1 Construction fence scope. This policy pertains to all new construction and or construction <br /> deemed by the Building Official to require proper separation from the public. This minimum barricade <br /> policy is to be used for all occupancies in conjunction to the minimum requirements set forth in <br /> Chapter 33. <br /> 3390.2 Construction fence requirements. All new construction and potentially hazardous <br /> construction (demolitions, long-term excavations, etc.) deemed by the Code official shall comply with <br /> the following barricade requirements. <br /> 1. A c hain link fence, a minimum of five (5) feet in height, shall be erected and must surround the <br /> project site, all tools and equipment, jobsite toilets, job trailers, materials, etc. Posts for the fence shall <br /> be metal "T" posts with a minimum height of seven (7) feet, driven at least one (1) foot below grade, <br /> and located a minimum of every eight (8) feet along the fence or as required by the Building Official <br /> 2. A c onstruction entrance shall be designated. The entrance will consist of two posts (of wood or <br /> metal) concreted or driven below grade a minimum of a third the height of the post. This entrance will <br /> have a gate provided between the posts and shall serve as the entrance for all usual construction <br /> traffic. All chain link fencing is to be strung tightly to these posts. <br /> 3. The Building Official may require a lock box to be attached to the post on the opening side of the <br /> gate to hold a key to the lock on the gate. The Building Official shall be provided the Code to this <br /> lockbox. And the key shall be accessible by the Building Official at all times. <br /> 3390.3 Temporary excavation barricades. All temporary excavations shall comply with the following <br /> requirements. <br /> 1. A n orange mesh barricade, a minimum of three (3) feet in height, shall be provided around all <br /> temporary excavations. 'T" posts on eight (8) foot centers (maximum) will provide support for the <br /> fence and the fence shall be properly anchored to the posts. <br /> 2. I f the excavation is within ten (10) feet of a public way, the excavation shall be covered by a { <br /> minimum of 3/4 plywood, 1/4 steel, or a similar cover for all area of the excavation that are within ten <br /> (10) feet of the public way. <br /> 17 <br />