Laserfiche WebLink
Session 1242, Minutes Page 8 <br />April 14, 1980 <br />Mrs. Elsie Glickert, 6712 Etzel, asked to -address the Council. Mrs. Glickert said <br />the area under discussion was an enclosure over the River Des Peres, and she wanted <br />to know why this beam is faulty, and if it is to be expected that more beams will <br />have to be replaced. Mr. Al Dieckgraefe, Director.of Public Works, was asked to <br />comment. Mr. Dieckgraefe said the beam that needs replacing was part of the orig- <br />inal walkway, and was left intact when River Des.Peres was covered with precast <br />concrete in 1966. The beam has been exposed to very humid.conditions and has <br />rusted. It has been repaired a._number af..times,.and it was felt to let it remain <br />there longer would be a hazard. The replacement beam will last 30 to 40 years, <br />and will be concrete, which will.not rust. Councilmember Sabol moved approval, <br />with Councilmember Kelley seconding .the motion. <br />Councilmember Lieberman expressed some concern that this beam needs replacing now, <br />since it was thought in 1966 that it would be adequate and last as long as the <br />project .(enclosing the River Des Peres channel at that location) would. He asked <br />that the city staff evaluate the civil engineering criteria that went into this <br />structure, and determine what kind of fault there may have been, and to try to <br />take some kind of corrective action for the future. Mr. 011endorff said he would <br />see that Mr. Lieberman gets a report. . <br />.Councilinember Adams said a contributing -factor to this deterioration might have <br />been the''heavy winter use of salt on roads and bridges in recent years. Mrs. <br />Glickert said there has been a very severe drainage problem at this intersection, <br />and said she hoped that this could be corrected while the area is under construc- <br />tion. <br />Councilmember Sabol,amended his motion to include the necessary transfer of funds, <br />and all voted Aye. <br />CONSIDERATION __OF,..BIDS- FOR—STREET ASD -ORB_ REPAIR _. <br />The City Manager said bid proposals were received by the City for Project No. 710 - <br />removing and replacing cracked or spalled areas of concrete pavement and repair of <br />curbs and/or gutters at various locations within the City, as follows: <br />E. R. Oesch Construction Co., Inc. $59,445.40 <br />Don Richardson Concrete Company $71,225.00 <br />Sahrmann Contracting Company $74,950.0.7 <br />Bennish & Bommarito Construction Co-, Inc $78,596.00 <br />Maryland Heights Concrete Contractors, Inca $84,140.00. <br />Oliver T. Ahal, Inc. $95,913.15 <br />Engineers' estimate $85,000...00 <br />Funding for this -project will come .1rom.the .Ap.ril,...,1979,, Bond -Issue... ...It is the <br />recommendation of . the .staff. ,that the contract be. awarded..to E. R..Oesch. Construc- <br />tion _Company., Inc.., _534 _.Bren-Litz. Lane, Ballwin,. Missouri,. for., their_ lowest and <br />best bid of $59,4.45..40.. Counc.ilmember.Adams moved approval., and noted that this <br />is the second street repair project awarded in the last several weeks, and that <br />it, too, has been..bid.under.the en.gineers_'--estimate.. .Councilmember_S.ab.ol second- <br />- <br />.-ed . the . mo tion,. which. passed_. unanimously._ .. .... ..._. _ _ <br />Councilmember Metcalfe ascertained that there would be moreconcreterepair for <br />other streets at a later time, and Mr. 011endorff confirmed that. <br />