Session 1644, M/nutes
<br />June 12, 1995
<br />
<br />*Hartog Oil Co.
<br />
<br />Froesel Oil Co.
<br />
<br />Page 4
<br />
<br />Diesel #2
<br />Diesel 60/40
<br />
<br />$ 89,373.00
<br /> 26,680.00
<br /> 11.070.00
<br />
<br />$ 89,511.00
<br /> 25,195.00
<br /> 10,370.00
<br />
<br />$ 95.754.60
<br /> 24,824.00
<br /> 10.035.00
<br />
<br />Total $127,123.00
<br />
<br />$125,076.00
<br />
<br />$120,513.60
<br />
<br /> *Hattog Oil Co.
<br /> (3 no bid)
<br /> $15,527 · 96
<br />*Woman-owned ~
<br />
<br />Energy Petroleum
<br />$14,564.75
<br />
<br />It was recommended that Energy Petroleum be given tb~ award for their low to-
<br />tal bid of $135,078.35.
<br />
<br />Annual Order - Stone Materials (#9). Invitations to bid on furnishing lime-
<br />stone macadam, trap rock, and gravel for the Park Maintenance and Street Di-
<br />visions were sent to 18 sources, with the following results:
<br />
<br />Brentwood Material
<br />Breckenrid~e Material
<br />N. B. West (6 no bid)
<br />Iron Mountain Trap Rock Co. (9 no bid)
<br />simpson Sand and Gravel Co. (4 no bid)
<br />Winter Bros. Material (4 no bid)
<br />Fred Weber Material Division (4 no bid)
<br />
<br />$18,000.00
<br />17,500.00
<br />8,625.00
<br />8,400.00
<br />4,401.95
<br />4,382.75
<br />3,600.00
<br />
<br />No minorities bid. It was rec~,,,,~nded that the award be split as follows:
<br />Iron Mountain Trap Rock--S8,400.00; Winter Bros. Material--S4,382.75; Fred
<br />Weber Material Division--S3,600.00, for an estimated total of $16,382.75.
<br />
<br />Annual Order - Concrete Products (#10). Invitations to bid on fur~shing
<br />concrete products, including various types of sand and cements for street,
<br />park, and golf course maintenanceprojects, fort he 1995-96 fiscal year were
<br />sentto 14 possible sources, with the following response:
<br />
<br /> Raineri Redi Mix (1 no bid)
<br /> Breckenridge Material (4 no bid)
<br /> ~rentwood Material (1 no bid)
<br /> *Gateway Ready Mix (7 no bid)
<br /> Kienstra Material (7 no bid)
<br /> St. C~arles Sand (6 no bid)
<br /> Jc~ Mac's (7 no bid)
<br /> General Material (3 no bid)
<br />*W~man-owned om~mny.
<br />$12,235.00
<br />10,080.00
<br />9,022.50
<br />5,850.00
<br />5,697.00
<br />3,473.25
<br />1,400.00
<br />1,128.35
<br />
<br />Splitting the bid as follows was recommended: Raineri--$4,927.50; St. Charles
<br />Sand--S3,401.25; Johnny Mac's--S1,400.00; General Material--S1,128.35, for a
<br />total estimated cost of $10,857.10.
<br />
<br />
<br />
|