Laserfiche WebLink
Session 1532, Minutes Page 2 <br /> November 19, 1990 <br /> (me <br /> 36 sets of turnout coats and pants for the Fire Department were sent to 11 <br /> possible suppliers, with the following response: <br /> Orr Safety Equipment (without suspenders) $18,473.76 <br /> Orr Safety Equipment (with suspenders) 18,732.60 <br /> Battalion Three, Inc. [female] 18,900.00 <br /> Banner Fire Equipment [female] 20,502.00 <br /> Firegear, Inc. [female] 20,890.44 <br /> MOSS - The Safety Specialist 21,240.00 <br /> Specifications call for bib or above-the-waist pants 5" high in front with <br /> gradual increase to 10" in back with an elasticized back waistband. Orr Safe- <br /> ty Equipment does not meet these specifications, therefore, it was recommended <br /> that the bid of $18,900 from Battalion Three, Inc. be accepted. The budget <br /> for this item is $11,000, so the additional $7,900 will have to be transferred <br /> from lower priority items including fire computers and fire hose replacement. <br /> Computer Terminals (#2) . Requests for quotation on five desktop computer ter- <br /> minals for the Planning Department were sent to eight suppliers, with the fol- <br /> lowing response: <br /> Computer Enterprise [minority female] - alternate <br /> equipment; not as specified for existing system $6,175 <br /> Microage 6,390 <br /> Computer Enterprise [minority female] 6,945 <br /> Creative Business Services 6,965 <br /> Creative Business Services - alternate bid; specified <br /> equipment with upgrade 7,155 <br /> It was recommended that the bid of $6,390 from Microage be accepted. This bid <br /> is slightly below budget estimates. <br /> Consideration of Bids for Sidewalk and Curb Repair Work (#3) . Bid proposals <br /> for sidewalk and curb repair were received as follows: <br /> D. Bennish Construction Co., Inc. $83,082.00 <br /> Gateway Contractors, Inc. 87,228.60 <br /> Midwest Mudjacking and Construction Co. 91,468.52 <br /> Williams Construction Contractors, Inc. 94,518.00 <br /> Engineer's Estimate $99,400.00 <br /> Funding will crane from General Revenue. Acceptance of the law bid of $83,082 <br /> from D. Bennish Construction Co., Inc., was recommended. <br /> Consideration of Bids for Mudjacking at Various Locations (#4) . Bid proposals <br /> for mudjacking at various locations were received as follows: <br /> Amecon, Inc. $ 7,215.00 <br /> (we Midwest Mudjacking & Construction Co. 9,879.00 <br /> Lithko Contracting, Inc. 15,873.00 <br />