My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5272
Public Access
>
City Council Ordinances
>
1981
>
5272
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/6/2004 2:47:38 PM
Creation date
11/5/2014 12:15:51 PM
Metadata
Fields
Template:
City Ordinances
Passed
1/5/1981
Ordinance Number
5272
Bill Number
7468
Introdate
12/8/1980
Description
Granting franchise agreement to Continental Cablevision
Introduced By
Adams
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
utilities are to be placed underground, the developer or property owner shall <br />give the Company reasonable notice of such comstruction or development, and of <br />the particular date on which open trenching will be available for the Company's <br />installation of conduit, pedestals and/or vaults, and laterals to be provided <br />at the Company's expense. The Company shall also provide specifications as <br />needed for trenching. <br /> <br /> Cost of trenching and easements to the development shall be <br />borne by the developer, except that if the Company fails to install its con- <br />duit, pedestals and/or vaults, and laterals within five (5) working days of the <br />date the trenches are available, as designated in the notice given by the <br />developer or property owner, then should the trenches be closed after the f~ve- <br />day period, the co~t of new trenching is to be borne by tbe Company. Except <br />for the notice of the particular date on which trenching will be available to <br />the Company, any notice provided to the Company by the City of a preliminary <br />plat request shall satisfy the requirement of reasonable notice if sent to the <br />local general manager or system engineer of the Company prior to approval of <br />the preliminary plat request. <br /> <br />Section 3. Construction and Technical Standards <br /> <br />a) GENERAL COMPLIANCE <br /> <br />1. The system shall be constructed, installed, operated <br />and n~intained in a manner consistent with all laws, <br />ordinances, construction standards, governmental <br />requirements, and detailed standards submitted by the <br />Company as part of its application, which standards are <br />incorporated by reference herein. Compliance standards <br />shall specifically include, but not be limited to the <br />following: <br /> <br />Exhibit A (attached hereto and incorporated herein by <br />reference) "System Performance Specifications~" <br /> <br />National Electrical Safety Code (National Bureau of <br />Standards)~ <br /> <br />National Electrical Code (National Bureau of Fire Under- <br />writers); <br /> <br />Bell System Code of Pole Line Construction~ Occupational <br />Safety and Health Act of 1970. <br /> <br />To the extend that such codes are inconsistent with <br />other provisions of this ordinance or with local law, <br />the more stringent law, as defined by the City, shall <br />govern. <br /> <br />18 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.