Laserfiche WebLink
<br />105.3.2 Rejected application: Rejected applications will be held on flle for 60 days after the <br />date of rejection. If the required information or corrections are not received within this <br />period of time, the application shall be deemed to have been abandoned. <br /> <br />105.6.1 Qualifications of contractors and workers: The building official shall not be <br />required to issue a permit unless the contractor and workers are qualified to carry out the <br />proposed work in accordance with the requirements of this code. Refusal or inability to <br />comply with code requirements on other work shall be considered as evidence of lack of <br />such qualifications. <br /> <br />105.8 Coordination with other jurisdictions: Where a building, structure, or premises is <br />constructed partially outside the city limits, the building official shall be authorized to enter <br />into agreements with the adjoining code jurisdictions to avoid duplication of permits, <br />inspections and fees. <br /> <br />(SECTION 106 CONSTRUCTION DOCUMENTS) <br /> <br />106.1 Exception: Construction documents otherwise meeting the requirements of this <br />Section which are submitted for a project, the details of which otherwise conform to the <br />requirements of this code, but whose documented estimated cost does not exceed $25,000, <br />need not have a design professional's stamp affixed. The issuance of a permit based on such <br />documents does not relieve their originator from otherwise complying with applicable state <br />laws concerning professional practice by unlicensed individuals. When the documented <br />project cost estimate exceeds $25,000, or where special conditions exist, the building official <br />will require the submittal of construction documents prepared by a registered design <br />professional, as indicated by his or her stamp and signature or their authorized facsimiles <br />appearing on each document in accordance with applicable state laws. <br /> <br />106.2.1 Grading and drainage: The site plan shall provide sufficient detail to determine <br />compliance with site grading and storm water drainage provisions of this code and of <br />applicable ordinances for the control, drainage and discharge of storm water. <br /> <br />106.3.1 Approval of construction documents: Delete in its entirety. <br /> <br />106.3.4.3 Visits to site: When so directed by the building official or when required by the <br />special inspection 'provisions of this code, the registered design professional shall make visits <br />to the site at intervals appropriate to the stage of the construction components requiring <br />controlled materials; or to determine whether the work is proceeding in accordance with the <br />construction of documents approved for the building permit. The registered design <br />professional shall periodically submit reports to the code official showing the results of such <br />periodic visits. <br /> <br />5 <br />